Stormwater & Sewer
Grand Glaize Wastewater Treatment Plant
This project consists of the expansion of an existing WWTP to provide odor control and process increasing quantities of wet weather flow.

01 Project summary
- Construction Cost: $50,000,000
- AFRAM Project Fee: $652,972
This project consists of the expansion of an existing WWTP to provide odor control and process increasing quantities of wet weather flow. Work included major equipment repair by replacement and electrical upgrades. AFRAM was part of the URS construction management team to provide peer reviews for civil and mechanical design, documentation, and constructability review. AFRAM also participated in the pre-construction phase by providing design peer review at the 30%, 60%, and 90% engineering deliverables, constructability review of drawings and specifications, and review of the engineer’s cost estimate. AFRAM also provided startup, commissioning, final acceptance, and close-out for the post construction phase.
From the Stormwater & Sewer Experience Work Sheet in ACOT’s capability statement (AFRAM Corporation).
02 More projects
Related experience.
Coldwater Creek Treatment Plant
AFRAM Corporation was part of the team led by Black & Veatch Corporation on the Coldwater Treatment Plant Improvements located at 13798 Old Halls Ferry Road in North St.
Creve Coeur Pump Station L-52
AFRAM was part of the team with URS to provide construction management services for the construction of a new 60 MGD capacity wastewater pump station.
Missouri River Wastewater Treatment Plant
AFRAM Corporation was part of the team led by URS Corporation on the Missouri River Wastewater Treatment Plant Improvements located in Maryland Heights in North St.

“Rock Solid Service at the heart of your project”