GSA Federal Courthouse & Administration Building
Design and construction management for this $15M Federal Courthouse and tenant areas, for the General Services Administration.
Washington University Administration & Multipurpose Building
A new $123 million, 216,000 square feet design/build Administration Building with red granite facade accented by white limestone.
New Busch Stadium Ball Park Commissioning
Construction inspections as a sub-consultant to Jacobs Engineering at the New Busch Stadium, St. Louis.
Central City Lofts Affordable Housing
ACOT acted as the Construction Manager on this 84-unit affordable housing project.
Washington University Arts & Science Building
A state-of-the-art building of 69,000 sf of classrooms, lecture hall and laboratory sciences.
New Jazz at Walter Street Circle
A 74 senior living mixed use apartments complex for Signature Development, designed to earn LEED certification.
Lindbergh Boulevard Bridge/Tunnel
Civil, structural, mechanical, electrical and plumbing/FP design with inspection and QA testing at St. Louis Lambert Airport.
Harris Stowe College
ACOT, through the previous company, was the Owner’s Representative for this project.
St. Louis Community College, South County Education and University Center
An off-campus extension of St. Louis Community College offering a highly personalized approach to education and technology.
Millennium Student Centre, University of Missouri-St. Louis
Cost estimating and scheduling, Owner’s Representative, and design reviews for civil, mechanical, electrical and environmental.
Benton Stadler Hall, University of Missouri-St. Louis
Cost estimating, project management, construction inspection, mechanical retrofitting and electrical upgrades.
Coldwater Creek Treatment Plant
AFRAM Corporation was part of the team led by Black & Veatch Corporation on the Coldwater Treatment Plant Improvements located at 13798 Old Halls Ferry Road in North St.
Creve Coeur Pump Station L-52
AFRAM was part of the team with URS to provide construction management services for the construction of a new 60 MGD capacity wastewater pump station.
Grand Glaize Wastewater Treatment Plant
This project consists of the expansion of an existing WWTP to provide odor control and process increasing quantities of wet weather flow.
Missouri River Wastewater Treatment Plant
AFRAM Corporation was part of the team led by URS Corporation on the Missouri River Wastewater Treatment Plant Improvements located in Maryland Heights in North St.
Boenker Sanitary Relief
AFRAM Corporation prepared the contract documents for the Metropolitan St.
Nettlecreek Brookwood Sanitary Relief Sewer
The project is located in the Grand Glaize Creek Watershed in the City of Town and Country.
Sanitary Relief and Lift Station
For the City of Fenton, AFRAM designed 2,000 feet of sanitary relief sewer and a lift station for an existing neighborhood that had been served by septic tanks.
Hurricane Creek Realignment Study
As part of phase one of airport improvements for the A380 aircraft, AFRAM Corporation, as a sub-consultant to Kimley-Horn and Associates Inc., was assigned the scope to evaluate the Winchester Road Tunnel under the center runway and under taxiway Yankee, along with the box culvert for Hurricane Creek to pass under the center runway.
Paddock Creek Improvements
Upon completion of a watershed study, approximately 220 feet of channel was lined with a concrete open box to carry the 100-year storm event.
Roof System (Rivet: Punch, Insert & Set)
Recent project, Transportation. Designed, built, tested and validated at the Automation Engineering facility in Fort Wayne, Indiana.
Underrun Test System
Recent project, Transportation. Designed, built, tested and validated at the Automation Engineering facility in Fort Wayne, Indiana.
Resin Applicator System
Recent project, Transportation. Designed, built, tested and validated at the Automation Engineering facility in Fort Wayne, Indiana.
Window Regulator System
Recent project, Transportation. Designed, built, tested and validated at the Automation Engineering facility in Fort Wayne, Indiana.
TIG Cell
Recent project, Automotive. Designed, built, tested and validated at the Automation Engineering facility in Fort Wayne, Indiana.
MIG Cell
Recent project, Automotive. Designed, built, tested and validated at the Automation Engineering facility in Fort Wayne, Indiana.
High Speed Bearing Assembly
Recent project, Automotive. Designed, built, tested and validated at the Automation Engineering facility in Fort Wayne, Indiana.
Electric Grid Insulator Encapsulating Process
Recent project, Utilities. Designed, built, tested and validated at the Automation Engineering facility in Fort Wayne, Indiana.
Medical Velcro Assembly
Recent project, Medical. Designed, built, tested and validated at the Automation Engineering facility in Fort Wayne, Indiana.
Medical Device Assembly
Recent project, Medical. Designed, built, tested and validated at the Automation Engineering facility in Fort Wayne, Indiana.
Window Regulator Switch AATS
Recent project, Automated Assembly. Designed, built, tested and validated at the Automation Engineering facility in Fort Wayne, Indiana.
Outside Mirror AATS
Recent project, Automated Assembly. Designed, built, tested and validated at the Automation Engineering facility in Fort Wayne, Indiana.
Sidewall System Concept
Recent project, Concept. Designed, built, tested and validated at the Automation Engineering facility in Fort Wayne, Indiana.
HUD Building Inspection & Evaluation
HUD physical need assessments of HUD properties in thirteen (13) states.
Runway 36R-18L Reconstruction
Reconstruction airfield for U.S. operations.
I-40/I-64 Highway Improvements
DOT-compliant roadway upgrades.
Beale Street Landing
Marine/port infrastructure.
Wastewater Treatment Facility
Full design/build.
LeMoyne-Owen College Housing
Institutional design/build.
Electrolux Manufacturing Facility
Electrolux construction management services.
NADDC Automotive Testing Laboratory, Lot II and V
Lot II and V supply, installation and training of NADDC automotive testing laboratory equipment and tools.
Chiller Unit Repairs, Workshop 1
Repairing two main chiller units in Workshop 1.
Lemay Pump Station
AFRAM, as a sub-consultant, prepared the preliminary concept schedule and resource-loaded design schedule for two options at the Lemay Wastewater Treatment Pump Station.
Harlem-Baden
For a number of years, severe and frequent flooding problems occurred in the areas of the City of St.
Coldwater Creek Bank Stabilization
The Metropolitan Sewer District (MSD) selected Geotechnology to conduct geotechnical investigations for the Fleurissant Parc Place slide evaluation.
02 More experience
Cost estimating accuracy, HUD assessments and stormwater work.
See the budget-versus-bid record behind ACOT’s estimating, the HUD properties assessed under the previous company, and the Stormwater & Sewer Experience Work Sheet.
Experience