Coldwater Creek Treatment Plant
North St. Louis County, Missouri
AFRAM Corporation was part of the team led by Black & Veatch Corporation on the Coldwater Treatment Plant Improvements located at 13798 Old Halls Ferry Road in North St.

Experience
Cost estimating accuracy, material testing, and stormwater and sewer experience from ACOT’s capability statement.
01 Cost estimating accuracy results
The following are a few project examples that demonstrate the accuracy of ACOT cost estimating results.
| # | Project description | Budget cost | Bid price | % differential |
|---|---|---|---|---|
| 1 | Maximum Detention Addition, St. Louis | $8,500,000 | $8,320,000 | 2.12 |
| 2 | Maximum Security Prison, RI | $56,000,000 | $54,800,000 | 2.14 |
| 3 | East Terminal Runway Expansion “Pkg. A” Lambert Airport | $9,000,000 | $8,700,000 | 3.33 |
| 4 | East Terminal Expansion “Pkg. B” Lambert Airport | $46,632,000 | $45,500,000 | 2.43 |
| 5 | Garage/Roadway, “Pkg. C” Lambert Airport | $22,000,000 | $21,300,000 | 3.18 |
| 6 | Capital Improvement “Pkg. B” Lambert Airport | $6,400,000 | $6,250,000 | 6.26 |
| 7 | Scot Elementary School | $10,000,000 | $9,400,000 | 6.00 |
| 8 | Student Center, University of Missouri | $22,156,000 | $21,300,000 | 3.86 |
| 9 | Elevator Upgrade, St. Louis Housing | $3,200,000 | $3,125,000 | 2.34 |
| 10 | Harris-Stowe College Library | $2,600,000 | $2,490,000 | 4.23 |
| 11 | Skilled Nurses Facilities, Farmington | $6,500,000 | $6,250,000 | 3.85 |
| 12 | Misc. Building Improvements, St. Louis | $1,200,000 | $1,089,000 | 9.25 |
| 13 | Benton/Stadler Hall Renovation Phase 1 | $1,800,000 | $1,790,000 | 0.56 |
| 14 | Addition/Renovation of 12 Libraries for the City of St. Louis | $24,000,000 | Preconstruction | |
| 15 | New St. Louis Justice Center | $60,521,000 | Schematic Phase only | |
| 16 | Renovation of 30 Fire Stations, City of St. Louis | $12,000,000 | Design | |
| 17 | Benton/Stadler Hall Renovation Phase 2 | $18,200,000 | $17,900,000 | 1.65 |
| 18 | Ebubu-Oneh Satellite Town Project | $1.5 Billion | Programming |
02 Material testing services

03 Stormwater & sewer experience work sheet
Work carried out by AFRAM Corporation, as presented in the ACOT capability statement, for the Metropolitan St. Louis Sewer District (MSD), the City of Fenton and the City of Memphis.
North St. Louis County, Missouri
AFRAM Corporation was part of the team led by Black & Veatch Corporation on the Coldwater Treatment Plant Improvements located at 13798 Old Halls Ferry Road in North St.
Saint Louis, Missouri
AFRAM was part of the team with URS to provide construction management services for the construction of a new 60 MGD capacity wastewater pump station.
Metropolitan St. Louis Sewer District, Saint Louis County, Missouri
This project consists of the expansion of an existing WWTP to provide odor control and process increasing quantities of wet weather flow.
Maryland Heights, Missouri
AFRAM Corporation was part of the team led by URS Corporation on the Missouri River Wastewater Treatment Plant Improvements located in Maryland Heights in North St.
Metropolitan St. Louis Sewer District, Saint Louis, Missouri
AFRAM Corporation prepared the contract documents for the Metropolitan St.
Metropolitan Sewer District, St. Louis, Missouri
The project is located in the Grand Glaize Creek Watershed in the City of Town and Country.
Metropolitan Sewer District
AFRAM, as a sub-consultant, prepared the preliminary concept schedule and resource-loaded design schedule for two options at the Lemay Wastewater Treatment Pump Station.
City of Fenton
For the City of Fenton, AFRAM designed 2,000 feet of sanitary relief sewer and a lift station for an existing neighborhood that had been served by septic tanks.
Memphis, Tennessee
As part of phase one of airport improvements for the A380 aircraft, AFRAM Corporation, as a sub-consultant to Kimley-Horn and Associates Inc., was assigned the scope to evaluate the Winchester Road Tunnel under the center runway and under taxiway Yankee, along with the box culvert for Hurricane Creek to pass under the center runway.
Metropolitan St. Louis Sewer District, Saint Louis County, Missouri
For a number of years, severe and frequent flooding problems occurred in the areas of the City of St.
Metropolitan Sewer District, St. Louis, Missouri
Upon completion of a watershed study, approximately 220 feet of channel was lined with a concrete open box to carry the 100-year storm event.
Florissant, Missouri
The Metropolitan Sewer District (MSD) selected Geotechnology to conduct geotechnical investigations for the Fleurissant Parc Place slide evaluation.

“Rock Solid Service at the heart of your project”