Boenker Sanitary Relief

AFRAM Corporation prepared the contract documents for the Metropolitan St.

01 Project summary

  • Construction Cost: $800,000
  • Project Fee: $89,168
  • Share of Work: 100%

AFRAM Corporation prepared the contract documents for the Metropolitan St. Louis Sewer District (MSD) for the installation of approximately 1,115 feet of 12-inch diameter sanitary sewer pipe to relieve surcharging of the existing section of 10-inch diameter and 8-inch diameter sanitary sewer during wet weather conditions. The project included a design study and submittal of redline plans and construction documents.

From the Stormwater & Sewer Experience Work Sheet in ACOT’s capability statement (AFRAM Corporation).