Stormwater & Sewer
Paddock Creek Improvements
Upon completion of a watershed study, approximately 220 feet of channel was lined with a concrete open box to carry the 100-year storm event.

01 Project summary
- Construction Cost: $400,000
- Project Fee: $45,000
- Share of Work: 100%
- Original Design Schedule: Five (5) months
Upon completion of a watershed study, approximately 220 feet of channel was lined with a concrete open box to carry the 100-year storm event. A transition was required at the north end of the project to meet an existing box culvert under Lindbergh Boulevard. AFRAM served as the prime consultant on this project, responsible for all civil design including drainage, hydraulics, and coordination with the District. Survey and geotechnical services were performed by subconsultants.
From the Stormwater & Sewer Experience Work Sheet in ACOT’s capability statement (AFRAM Corporation).
02 More projects
Related experience.
Coldwater Creek Treatment Plant
AFRAM Corporation was part of the team led by Black & Veatch Corporation on the Coldwater Treatment Plant Improvements located at 13798 Old Halls Ferry Road in North St.
Creve Coeur Pump Station L-52
AFRAM was part of the team with URS to provide construction management services for the construction of a new 60 MGD capacity wastewater pump station.
Grand Glaize Wastewater Treatment Plant
This project consists of the expansion of an existing WWTP to provide odor control and process increasing quantities of wet weather flow.

“Rock Solid Service at the heart of your project”