Projects
Past performance and relevant experience.
Federal courthouses, university buildings, stadium commissioning, housing, airfield and highway work.
Coldwater Creek Treatment Plant
AFRAM Corporation was part of the team led by Black & Veatch Corporation on the Coldwater Treatment Plant Improvements located at 13798 Old Halls Ferry Road in North St.
Creve Coeur Pump Station L-52
AFRAM was part of the team with URS to provide construction management services for the construction of a new 60 MGD capacity wastewater pump station.
Grand Glaize Wastewater Treatment Plant
This project consists of the expansion of an existing WWTP to provide odor control and process increasing quantities of wet weather flow.
Missouri River Wastewater Treatment Plant
AFRAM Corporation was part of the team led by URS Corporation on the Missouri River Wastewater Treatment Plant Improvements located in Maryland Heights in North St.
Boenker Sanitary Relief
AFRAM Corporation prepared the contract documents for the Metropolitan St.
Nettlecreek Brookwood Sanitary Relief Sewer
The project is located in the Grand Glaize Creek Watershed in the City of Town and Country.
Sanitary Relief and Lift Station
For the City of Fenton, AFRAM designed 2,000 feet of sanitary relief sewer and a lift station for an existing neighborhood that had been served by septic tanks.
Hurricane Creek Realignment Study
As part of phase one of airport improvements for the A380 aircraft, AFRAM Corporation, as a sub-consultant to Kimley-Horn and Associates Inc., was assigned the scope to evaluate the Winchester Road Tunnel under the center runway and under taxiway Yankee, along with the box culvert for Hurricane Creek to pass under the center runway.
Paddock Creek Improvements
Upon completion of a watershed study, approximately 220 feet of channel was lined with a concrete open box to carry the 100-year storm event.
Lemay Pump Station
AFRAM, as a sub-consultant, prepared the preliminary concept schedule and resource-loaded design schedule for two options at the Lemay Wastewater Treatment Pump Station.
Harlem-Baden
For a number of years, severe and frequent flooding problems occurred in the areas of the City of St.
Coldwater Creek Bank Stabilization
The Metropolitan Sewer District (MSD) selected Geotechnology to conduct geotechnical investigations for the Fleurissant Parc Place slide evaluation.
02 More experience
Cost estimating accuracy, HUD assessments and stormwater work.
See the budget-versus-bid record behind ACOT’s estimating, the HUD properties assessed under the previous company, and the Stormwater & Sewer Experience Work Sheet.
Experience

“Rock Solid Service at the heart of your project”